Pages

Thursday 27 September 2018

Bridge Labeling


Today for inquiry we made our own version of the Panmure bridge on a google drawing. We labeled all of the different parts of the bridge and that are used to build the bridge. There are 4 different parts to the bridge that is the bridge deck so people and cars can go across the iron swing opens so the boats can get to the other side, abutment is to hold the iron swing and the piles holds the bridge deck and prevents it from collapsing. 

No comments:

Post a Comment